Running venting


On this day I was running some venting for 2 bathroom groups. (A bathroom group is usually a toilet, shower, and a vanity). I learned how to better secure fittings when they’re in a hard to reach spot (in the second image, theres a hole at the bottom that needed a fitting.) I also had to plan where I was going to connect the two bathrooms, and where it was going to be vented outside the building. I followed the code in vermont for this project, so it used a 1.5" pipe. Overall I would say this project helped me improve my planning skills and general PVC work.